PROJECTS
Beveridge Outfall Sewer Main
This project involved
-
Plant Hire
-
Trenching for Sewer main
-
Breaking rock/ Downsizing/ Sorting rock
-
Backfill and Compaction
Client: Jaydo
Robinsons Road Level Crossing Removal
This project involved
-
Plant Hire
-
Boxing out to subgrade to realign road Formation prep
Client: Fulton Hogan
Murrabit Township Drainage Stage 5 & Stage 6
This project involved
-
Installation of drainage in the town of Murrabit
Client: S&R Engineering and Construction
TO05 Irrigation Pipeline Murrabit
This project involved
-
Installation of 5.5km of DN500 and DN450 Poly Irrigation Pipeline. 9 Metered Irrigation Outlets
-
Decommission of existing outlets, road crossing culverts and channel banks.
-
Majority of works completed during live irrigation season.
Client: : S&R Engineering and Construction
Boundary Road, Armstrong Creek Watermain Lowering
This project involved
-
Replace and lower section of OD615 Mild Steel Concrete Lined Watermain under Barwon Heads Road to accommodate new drainage outfall culverts to be built above the watermain
-
Installation of butterfly valves with bypass, scour valve and air valve.
Client: Keystone Civil for Barwon Water
Monash Freeway Upgrade
This project involved
-
Plant hire at Beaconsfield intersection and O Shea Road upgrade
-
Demolition of existing infrastructure
-
Boxing out road to level with GPS
-
Digging around services
-
Road formation prep
-
Forming batters
-
Topsoiling
Client: Southern Plant Hire for CPB Contractors
Raised Thresholds Reynard Street Pascoe Vale South and Middle Street Glenroy
This project involved
-
Removal of asphalt, kerb and channel and footpath
-
Drainage works
-
Installation of raised pedestrian threshold, kerb and channel, footpath, asphalt and landscaping
Client: Moreland City Council
Taylors Road Watermain
This project involved
-
Installation of 550m of DN450 PVC Watermain, flow meter, air valve, scour valve and connections to existing Watermains
Client: Jaydo
Bacchus Marsh Irrigation District Stage 4 Spur 12
This project involved
-
Installation of 850m of DN450 GRP irrigation pipeline
-
3 irrigation outlets, air valves and scour valve
Client: Jaydo
Irrigation Pipeline Project Macorna
This project involved:
-
Installation of 3km DN630 and DN560 poly irrigation pipeline
Client: S&R Engineering and Construction
Water Efficiency Project
This project involved
-
Installation of 5.5km of DN500 and DN450 Poly Irrigation Pipeline
-
9 Metered Irrigation outlets.
-
Decommission of existing outlets, road crossing culverts, channel banks
-
Majority of works completed during live irrigation season
Client: S&R Engineering and Construction
Watermains Project Whiteside Road Beaconsfield
This project involved
-
Installation of 1.5km of OD813 MSCL Watermain
-
1.5km of 300mm PVC and 355mm Poly Recycled Watermain and associated works
Client: FHDB for South East Water
Wetland Construction Rehabillitation Creek
This project involved
-
Drainage Installation
-
Creek Rehabilitation
-
Wetland Construction
-
Construction of Rock Beaching
-
Bypass Pumping
Client: Melbourne Water - SFP Joint Venture (Downer, Abergeldie, Stantec)
Melbourne Airport Foxtrot Apron Infill
This project involved
-
Concrete Removal
-
Drainage
-
Earthworks
Client: Melbourne Airport - Fulton Hogan
Blackburn Station Remedial Drainage
This project involved
-
Construction of Concrete Pits
-
Working with Live Mains
-
Installation of Drainage
-
Live Drainage Tie Ins
-
Confined Space Works
Client: Level Crossing Removal Authority - CPB Contractors & Arcadis
GMW Connections - Channel Remediation Works
This project involved
-
Channel Clay Lining
-
Construct Greenfield Channel
-
On Farm Channel Construction
-
Channel HDPE Plastic Lining
Client: Golburn Murray Water - John Holland
GMW Connections - Pipeline Installation
This project involved
-
Excavation & Trenching
-
HDPE Pipe Welding
-
Embedment Material Compaction
-
Meter Outlet Installation
Client: Golburn Murray Water - John Holland
GMW Connections - Regulator Construction
This project involved
-
Detailed Excavation
-
Precast Concrete Installation
-
Heavy Lifts
-
Rock Beaching
Client: Golburn Murray Water - John Holland
Ballan Road Water Main Stage 4 & 5
This project involved
-
DN1200, DN900 & DN600 MSCL Water Main & Recycled Water Main
-
Excavation & Trenching
-
Pipelaying Works
Client: Western Water
Sunbury Treatment Plant Upgrade
This project involved
-
Bioreactor Tank Inlet Works
-
Construction of an Outfall Pipeline
-
Site Landscaping & other minor works
Client: Western Water - Downer
Golburn Murray Water Connections
This project involved
-
Irrigation Pipeline Installation
-
Metered Outlet Installation
Client: Delcon Civil
Blackburn Station Level Crossing Removal
This project involved
-
Detailed Excavation
-
Structures Demolition
-
Shift Works
Client: Level Crossing Removal Authority - CPB Contractors & Arcadis
Woodlea Estate - Outfall Sewer Construction
This project involved
-
Deep Trenching
-
Drilling & Blasting into hard rock
-
Sewer Installation
Client: Western Water - Spire
Drainage & Rockwood Construction
This project involved
-
Concrete Cut Off Wall Installation
-
Preparation of Subgrade
-
Installation of Filter / Embedment Layer
-
Constriction of Rock Beaching
Client: Melbourne Water - SFP Joint Venture (Downer, Abergeldie, Stantec)
Golburn Murray Water Connections
This project involved
-
Installation of Metered Irrigation Outlets
Client: John Holland
Golburn Murray Water Connections
This project involved
-
Decommissioning Road Culverts
-
Installation of Metered Irrigation Outlets
Client: S&R Engineering & Construction